Been busy in my friends workshop preparing all the steel elements of the Gardenqub.
Here are some pics of the progress:
Elbow assembled with some prepared off cuts of the frame elements for testing.
All the pieces for the joist hangers.
Drilling the mounting holes that will join the frame elements to the elbows.
The 4 upright elements, and the 2 short floor frame elements are ready. In the background you can see the 2 long floor frame elements which still require 116 holes drilled. 104 of them require thread tapping as well. Will be a busy day tomorrow.
Here are some pics of the progress:
Elbow assembled with some prepared off cuts of the frame elements for testing.
All the pieces for the joist hangers.
Drilling the mounting holes that will join the frame elements to the elbows.
The 4 upright elements, and the 2 short floor frame elements are ready. In the background you can see the 2 long floor frame elements which still require 116 holes drilled. 104 of them require thread tapping as well. Will be a busy day tomorrow.
No comments:
Post a Comment